|
| |
|
| |
|
|
 |
|
 |
|
| |
|
|
|
|
|
|
| |
|
| |
|
|
| |
| |
| Shanghai Everbright Convention & Exhibition, Exhibition & Convention Venues
|
|
|
| |
Address: No.66 Caobao Rd., Xuhui District, Shanghai
PC: 200235
Tel: +86 21 6484 2500
Fax: +86 21 6482 0944
E-mail: ebhotel@secec.com
Website: www.ebexhibition.com |
|
| |
|
|
To the Bund: 12km
To People’s Square: 8km
To Lujiazui: 15km
To Railway Station: 12km
To Pudong International Airport: 50km
To Hongqiao International Airport: 15km |
|
|
| |
|
|
|
Director of Marketing: Mr. XiaoBing Xue
|
|
|
| |
| ● Access & Accessibility : |
|
|
|
|
|
Metro (0.5km), Taxi Station, Parking Lot (700)
|
|
|
| |
|
|
| Hua Ting Hotel & Towers, Hua Xia Hotel, Jian Guo Hotel |
|
|
| |
| ● Meeting Support Facilities : |
|
|
|
|
| Portable Stage, Closed Circuit TV, Multi-microphone System,LCD Projector, Multi-size Screen, AV Equipment, Slide Projector,Interpretation Facilities, Laser Beam Pointer, Teleconferences, Full Range of Lighting Equipment, Overhead Projector |
|
|
| |
| ● Technical Data of West Exhibition Halls : |
|
|
|
| Facilities |
West Exhibition Hall The First Floor |
Classroom Style (person) |
West Exhibition Hall The Third Floor |
| Entrance |
Carriage slope A rolling shutter:5.3m(w)x4.3m(h) |
4 cargo lifts of 5 tons,
1cargo lift of 3 tons |
4 cargo lifts of 5 tons
1 cargo lift of 3 tons |
| Carriage slope B rolling shutter:4m(w)x7m(h) |
| West unloading platform 2 rolling shutters: 8.05m(w)x6m(h) |
2 rolling shutters 4.25m(w)x4.5m(h)
Unloading platform: 9m(w)x8m(l) |
| South unloading platform A rolling shutter: 5.4m(w)x6m(h) |
| South unloading platform A rolling shutter: 5.4m(w)x6m(h) |
| Moving –in facilities |
Truck, forklift, crane. etc. |
Hydraulic system |
Hydraulic system |
| Floor |
Master-top 100 (wear resisting material ) |
Master-top 100 (wear resisting material ) |
Master-top 100 (wear resisting material ) |
| Loading Capacity |
5000kg/sqm |
1000kg/sqm |
1000kg/sqm |
| Construction Height |
9.0m |
Center: 5.8m, Two sides: 4.5m |
Two sides: 4.5m(with a 2000sqm central hall of 18m apex height) |
| Escalator |
4 |
4 |
2 |
| Lift |
2 passenger lifts of 1.35 tons |
2 passenger lifts of 1.35 tons |
2 passenger lifts of 1.35 tons |
No.4 cargo lift of 3 tons
Door size: 2m(w)x2.4m(h)
Volume: 2.5m(w)x3.54m(l) x2.44m(h) |
No.4 cargo lift of 3 tons
Door size: 2m(w)x2.4m(h)
Volume: 2.5m(w)x3.54m(l) x2.44m(h) |
No.4 cargo lift of 3 tons
Door size: 2m(w)x2.4m(h)
Volume: 2.5m(w)x3.54m(l) x2.44m(h) |
No.5 and No.7 cargo lifts of 5 tons
Door size: 2m(w)x2.4m(h)
Volume: 2.5m(w)x3.54m(l)x 2.44m(h) |
No.5 and No.7 cargo lifts of 5 tons
Door size: 2m(w)x2.4m(h)
Volume: 2.5m(w)x3.54m(l)x 2.44m(h) |
No.5 and No.7 cargo lifts of 5 tons
Door size: 2m(w)x2.4m(h)
Volume: 2.5m(w)x3.54m(l)x 2.44m(h) |
| No.6 cargo lift of 5 tons
Door size: 3m(w)x2.5m(h)
Volume: 3.2m(w)x 5.4m(l)x2.5m(h) |
No.6 cargo lift of 5 tons
Door size: 3m(w)x2.5m(h)
Volume: 3.2m(w)x 5.4m(l)x2.5m(h) |
No.6 cargo lift of 5 tons
Door size: 3m(w)x2.5m(h)
Volume: 3.2m(w)x 5.4m(l)x2.5m(h) |
| No.8 cargo lift of 5 tons
Volume: 4m(w)x6.5m(l)x3.3m(h) |
No.8 cargo lift of 5 tons
Volume: 4m(w)x6.5m(l)x3.3m(h) |
No.8 cargo lift of 5 tons
Volume: 4m(w)x6.5m(l)x3.3m(h) |
| Electricity |
380/220V 2500KW |
380/220V 2000KW |
380/220V 2000KW |
| Compressed Air |
6-8 BAR flexible |
6-8 BAR flexible |
6-8 BAR flexible |
| Lighting |
200LX |
200LX |
200LX |
| Water Supply |
21 water supply vents, diameter 15mm;
8 water supply vents, diameter 50mm |
29 water supply vents, diameter 15mm |
20 water supply vents, diameter 15mm |
| Drainage |
10 ground drainage, diameter 100mm |
10 ground drainage, diameter 75mm |
10 ground drainage, diameter 75mm |
| Fire Proof |
Automatic water, sprinkling system, hydrant,
smoke alarming system, hand fire extinguisher |
Automatic water, sprinkling system, hydrant,
smoke alarming system, hand fire extinguisher |
Automatic water, sprinkling system, hydrant,
smoke alarming system, hand fire extinguisher |
| Air Conditioner |
Summer: 26°C,
Winter: 18°C |
Summer: 26°C,
Winter: 18°C |
Summer: 26°C,
Winter: 18°C |
| Ventilation |
157000 m3/hour |
110000 m3/hour |
A82000 m3/hour |
| Telephone |
IDD&DDD:180, Extension: 90 |
IDD&DDD:180, Extension: 90 |
IDD&DDD:180, Extension: 90 |
| Security |
24 hours |
24 hours |
24 hours |
| Broadcasting System |
Exhibition halls |
Exhibition halls |
Exhibition halls |
| Emergency Illumination |
| Meeting Room |
132sqm No.1 meeting room at interlinings of second floor
90sqm VIP room at interlinings of second floor
|
110sqm No.2 meeting room at interlinings of third floor |
110sqm No.4 meeting room at interlinings of fifth floor |
| Toilets |
Male: 2, Female: 2 |
Male: 2, Female: 2 |
Male: 2, Female: 2 |
| Drinking Water Supply |
1 |
1 |
1 |
| |
|
| |
| ● Technical Data of East Exhibition Halls : |
|
|
|
| Facilities |
East Exhibition Hall The First Floor |
| Entrance |
slope rolling shutter: 8m(w)x4m(h); platform rolling shutter:
3m(w)x4m(h) |
| Moving –in facilities |
Hydraulic |
| Floor |
Granite |
| Loading Capacity |
1000kg/sqm |
| Construction Height |
2.8m; Central hall 18m |
| Escalator |
2 |
| Lift |
4 sightseeing lifts;1 cargo lift of 2 tons;2 cargo lifts of 1tons |
| Electricity |
380/220V 800KW |
| Compressed Air |
6-8 BAR flexible |
| Lighting |
200LX |
| Water Supply |
3 water supply vents, diameter 25mm |
| Drainage |
To the pool |
| Fire Proof |
Automatic water, sprinkling system, hydrant, smoke
alarming system, hand fire extinguisher |
| Air Conditioner |
Summer: 26°C, Winter: 18°C |
| Ventilation |
75000 m3/hour |
| Telephone |
IDD&DDD:200 |
| Security |
24 hours |
| Broadcasting System |
Exhibition halls |
Emergency Illumination |
| Toilets |
Male: 1, Female: 1 |
| |
|
| |
| ● Function Rooms Basic Information : |
|
|
|
| Function Room |
Basic Info |
Capacity |
Fixed AV Equipments |
| Fl |
㎡ |
L(m)x
W(m) |
H
(m) |
Class
room |
Thea ter |
U-shape |
Holl
ow |
Ban
quet |
Buff
et |
Micro
phone |
Wireless Micro phone |
Pro
jector |
Scre
en |
| Grand Ballroom |
2 |
1274 |
28x39 |
7 |
550 |
1500 |
-- |
-- |
900 |
800 |
4 |
4 |
★ |
210’ |
| Ballroom front Hall |
2 |
400 |
20.25x
14.5 |
7 |
160 |
250 |
-- |
-- |
300 |
250 |
4 |
4 |
-- |
-- |
| Ballroom Back Hall |
2 |
500 |
20.25x
13.72 |
7 |
240 |
400 |
-- |
-- |
450 |
450 |
-- |
-- |
-- |
-- |
| Ballroom Side Hall |
2 |
70 |
7.40x
39.5 |
7 |
100 |
180 |
-- |
-- |
150 |
100 |
-- |
-- |
-- |
-- |
| Guangda No.1 |
2 |
250 |
24.5x
9.37 |
3.2 |
180 |
250 |
60 |
60 |
180 |
120 |
2 |
2 |
★ |
210’ |
| Guangda No.2 |
2 |
22 |
4.22x
5.25 |
2.8 |
-- |
-- |
-- |
-- |
10 |
-- |
-- |
-- |
-- |
-- |
| Guangda No.3 |
2 |
20 |
3.8x
5.25 |
2.8 |
-- |
-- |
-- |
-- |
10 |
-- |
-- |
-- |
-- |
-- |
| Guangda No.4 |
2 |
20 |
3.8x
5.25 |
2.8 |
-- |
-- |
-- |
-- |
10 |
-- |
-- |
-- |
-- |
-- |
| Guangda No.5 |
2 |
10 |
3.9x
2.55 |
2.8 |
-- |
-- |
-- |
-- |
10 |
-- |
-- |
-- |
-- |
-- |
| Guangda No.6 |
2 |
10 |
3.9x
2.55 |
2.8 |
-- |
-- |
-- |
-- |
10 |
-- |
-- |
-- |
-- |
-- |
| Guangda No.7 |
2 |
130 |
15.85x
7.35 |
3.2 |
80 |
150 |
30 |
30 |
70 |
50 |
2 |
2 |
★ |
210’ |
| Guangda No.8 |
2 |
240 |
21.7x
11.52 |
3.2 |
140 |
220 |
40 |
40 |
150 |
140 |
2 |
2 |
★ |
210’ |
| Guangda No.9 |
2 |
180 |
16.35x
11.36 |
3.2 |
100 |
160 |
40 |
40 |
120 |
90 |
2 |
2 |
★ |
210’ |
| Guangda No.10 |
2 |
410 |
22.73
15.6 |
3.2 |
220 |
350 |
80 |
80 |
220 |
170 |
2 |
2 |
★ |
210’ |
| Guangda No.11 |
2 |
95 |
14.8x
6.73 |
3.2 |
60 |
100 |
-- |
-- |
50 |
-- |
2 |
2 |
★ |
210’ |
| Guangda No.12 |
2 |
60 |
7.87x
6.85 |
2.8 |
40 |
50 |
-- |
-- |
20 |
-- |
-- |
-- |
-- |
-- |
| Guangda No.15 |
2 |
30 |
4.56x
6.85 |
2.8 |
24 |
35 |
-- |
-- |
10 |
-- |
-- |
-- |
-- |
-- |
| Guangda No.16 |
2 |
55 |
8.28x
6.85 |
2.8 |
50 |
60 |
-- |
-- |
20 |
-- |
-- |
-- |
-- |
-- |
| Guangda No.17 |
2 |
30 |
4.56x
6.85 |
2.8 |
24 |
35 |
-- |
-- |
10 |
-- |
-- |
-- |
-- |
-- |
| Guangda No.18 |
2 |
60 |
7.87x
6.85 |
2.6 |
50 |
60 |
-- |
-- |
20 |
-- |
-- |
-- |
-- |
-- |
| Guangda No.19 |
2 |
100 |
15.38x
6.8 |
2.8 |
-- |
12 |
-- |
-- |
30 |
-- |
-- |
-- |
-- |
-- |
| Guangda No.20 |
2 |
60 |
9.7x
7.8 |
2.8 |
30 |
40 |
-- |
-- |
20 |
-- |
-- |
-- |
-- |
-- |
| |
|
| |
|
|
 |
| EAST HALL FLOOR PLAN 1 |
 |
| EAST HALL FLOOR PLAN 2 |
 |
| WEST HALL FLOOR PLAN (1F) 1 |
 |
| WEST HALL FLOOR PLAN (1F) 2 |
 |
| WEST HALL FLOOR PLAN (2F) 1 |
 |
| WEST HALL FLOOR PLAN (2F) 2 |
 |
| WEST HALL FLOOR PLAN (3F) 1 |
 |
| WEST HALL FLOOR PLAN (3F) 2 |
|
| |
| |
|
|
| |
|
|
|
| |
| |
|
|
| |
|
|
| |
|
|
|
The Official Shanghai China Travel Website is a practical and authoritative guide for visitors who travel to Shanghai China,
and those corporations engaged in planning and organizing corporate incentive travel, conventions, exhibitions
and events (MICE) in Shanghai China, covering Shanghai map, weather, flights, airport, train, hotels, restaurants, travel,
expo travel, attractions, shopping, art, sports, nightlife, exhibitions, trade fairs, conventions, meetings, events etc. |
|
|
| Copyright © 2005-2011 Shanghai Municipal Tourism Administration |
|
|
| Shanghai ICP Certificate 06061657 |
| |
|
|
|